top of page

Flood Action Group

About the Flood Action Group (FAG)


This exists as a coordinating body for the whole village and formally as a Flood Action Group (FAG). The main aims being:-

 

  • Act as a point of contact between the Parish Council, the residents of the village and all the agencies (Environmental Agency, Inland Drainage Board and the Lead Local Flood Authority - North Yorkshire Council) 

  • Lobby for improvements to flood alleviation schemes, specifically around the junction of Mill Lane and Main Street; the Fleet (Pailbank Drain) and the river bank. 

  • To help manage flood events by liaising with the agencies and operation of PC owned equipment

​

​​​​​​​​​​​​​​​​​​​​​​​​Mill Lane Pumping Station

 

On the side of the green cabinet there is a yellow alarm beacon. If this is lit it means there is a faulty pump or high level. Please report this if possible or any queries please contact: Martin Farrar 07393419027

​

FAG Procedure for Flooding

​

This procedure is a section from the Community Resilience Scheme lodged with NYCC. It contains the actions taken by Flood Committee members, trigger levels and contact details: Flood Committee Procedure for Flooding

Current Members

 

Martin Farrar, Councillor (Chair) and EA Flood Warden

Ian Dennis, Councillor (Vice Chair)

Malcolm Fisher, EA Flood Warden

Terence Caine

Colin Lisle

Tony Linley

Copyright: Ryther Cum Ozendyke Parish Council 18th November 2026

​

bottom of page